Climate Change Data Portal
DOI | 10.1016/j.resconrec.2018.11.022 |
Environmental optimisation of mine scheduling through life cycle assessment integration | |
Pell, Robert1,3; Tijsseling, Laurens1; Palmer, Luke W.1; Glass, Hylke J.1; Yan, Xioayu2; Wall, Frances1,2; Zeng, Xianlai3; Li, Jinhui3 | |
发表日期 | 2019 |
ISSN | 0921-3449 |
EISSN | 1879-0658 |
卷号 | 142页码:267-276 |
英文摘要 | Life cycle assessments (LCA) are useful to quantify the environmental costs of mining projects, however the application of LCA is often a retrospective environmental measurement of operating mines. This paper presents a novel methodology of carrying out a LCA to generate life cycle impact assessment data that can form an environmental block model of a deposit. These spatially explicit data can then be used as a constraint within long-term mine scheduling simulations. The results indicate that significant reductions in global warming impact can be achieved at a small economic cost. For example using an environmental constraint it was possible to achieve 91.9% of the global warming impact whilst achieving 95.9% of the net present value compared to the baseline. Different constraints and economic scenarios are explored and multi-criteria decision analysis is carried out. This approach enables environmental considerations to be included in strategic mine planning. This is important because mining will continue to form an important part of our society for the foreseeable future. Integrating environmental considerations into the earliest stages of mine planning can assist in driving environmentally responsible raw material extraction. |
WOS研究方向 | Engineering ; Environmental Sciences & Ecology |
来源期刊 | RESOURCES CONSERVATION AND RECYCLING
![]() |
文献类型 | 期刊论文 |
条目标识符 | http://gcip.llas.ac.cn/handle/2XKMVOVA/93864 |
作者单位 | 1.Univ Exeter Penryn Campus, Camborne Sch Mines, Penryn TR10 9FE, Cornwall, England; 2.Univ Exeter Penryn Campus, Environm & Sustainabil Inst, Penryn TR10 9FE, Cornwall, England; 3.Tsinghua Univ, Key Lab Solid Waste Management & Environm Safety, Sch Environm, Beijing 100084, Peoples R China |
推荐引用方式 GB/T 7714 | Pell, Robert,Tijsseling, Laurens,Palmer, Luke W.,et al. Environmental optimisation of mine scheduling through life cycle assessment integration[J],2019,142:267-276. |
APA | Pell, Robert.,Tijsseling, Laurens.,Palmer, Luke W..,Glass, Hylke J..,Yan, Xioayu.,...&Li, Jinhui.(2019).Environmental optimisation of mine scheduling through life cycle assessment integration.RESOURCES CONSERVATION AND RECYCLING,142,267-276. |
MLA | Pell, Robert,et al."Environmental optimisation of mine scheduling through life cycle assessment integration".RESOURCES CONSERVATION AND RECYCLING 142(2019):267-276. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。