Environmental Baseline Monitoring Project. Phase II, final report
出版日期2017
出版者British Geological Survey
英文摘要This report is submitted in compliance with the conditions set out in the grant awarded to the British Geological Survey (BGS), for the period April 2016 鈥?March 2017, to support the jointly-funded project "Science-based environmental baseline monitoring". It presents the results of monitoring and/or measurement and preliminary interpretation of these data to characterise the baseline environmental conditions in the Vale of Pickering, North Yorkshire and for air quality, the Fylde in Lancashire ahead of any shale gas development. The two areas where the monitoring is taking place have seen, during the project, planning applications approved for the exploration for shale gas and hydraulic fracturing. It is widely recognised that there is a need for good environmental baseline data and establishment of effective monitoring protocols ahead of any shale gas/oil development. This monitoring will enable future changes that may occur as a result of industrial activity to be identified and differentiated from other natural and man-made changes that are influencing the baseline. Continued monitoring will then enable any deviations from the baseline, should they occur, to be identified and investigated independently to determine the possible causes, sources and significance to the environment and public health. The absence of such data in the United States has undermined public confidence, led to major controversy and inability to identify and effectively deal with impact/contamination where it has occurred. A key aim of this work is to avoid a similar situation and the independent monitoring being carried out as part of this project provides an opportunity to develop robust environmental baseline for the two study areas and monitoring procedures, and share experience that is applicable to the wider UK situation. This work is internationally unique and comprises an inter-disciplinary researcher-led programme that is developing, testing and implementing monitoring methodologies to enable future environmental changes to be detected at a local scale (individual site) as well as across a wider area, e.g. 鈥榮hale gas play鈥?where cumulative impacts may be significant. The monitoring includes: water quality (groundwater and surface water), seismicity, ground motion, soil gas, atmospheric composition (greenhouse gases and air quality) and radon in air. Recent scientific and other commissioned studies have highlighted that credible and transparent monitoring is key to gaining public acceptance and providing the evidence base to demonstrate the industry鈥檚 impact on the environment and importantly on public health. As a result, BGS and its partners initiated in early 2015, a co-ordinated programme of environmental monitoring in Lancashire that was then extended to the Vale of Pickering in North Yorkshire after the Secretary of State for Energy and Climate Change (BEIS) awarded a grant to the British Geological Survey (BGS). The current duration of the grant award is to 31st March 2018. It has so far enabled baseline environmental monitoring for a period of more than 12 months. With hydraulic fracturing of shale gas likely to take place during late 2017/early 2018, the current funding will allow the environmental monitoring to continue during the transition from baseline to monitoring during shale gas operations. This report presents the monitoring results to April 2017 and a preliminary interpretation. A full interpretation is not presented in this report as monitoring is continuing and it is expected that there will be at least six months of additional baseline data before hydraulic fracturing takes place. This represents up to 50% more data for some components of the montoring, and when included in the analysis will significantly improve the characterisation and interpretation of the baseline. In addition to this report, the BGS web site contains further information on the project, near real-time data for some components of the monitoring and links to other projects outputs, e.g. reports and videos (www.bgs.ac.uk/research/groundwater/shaleGas/monitoring/home.html).
英文关键词GroundwaterBGS;Groundwater;Groundwater and methane;Groundwater monitoring
URLhttp://nora.nerc.ac.uk/id/eprint/517889/1/OR_17_049__PhaseII_Final_Report_280917.pdf
国家英国
语种英语
来源机构英国自然环境研究理事会
文献类型科技报告
条目标识符http://gcip.llas.ac.cn/handle/2XKMVOVA/86619
推荐引用方式
GB/T 7714
. Environmental Baseline Monitoring Project. Phase II, final report:British Geological Survey,2017.
条目包含的文件 下载所有文件
文件名称/大小 资源类型 版本类型 开放类型 使用许可
517889.pdf(24476KB)科技报告 开放获取CC BY-NC-SA浏览 下载
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
百度学术
百度学术中相似的文章
必应学术
必应学术中相似的文章
相关权益政策
暂无数据
收藏/分享
文件名: 517889.pdf
格式: Adobe PDF
此文件暂不支持浏览

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。