CCPortal
DOI10.5942/jawwa.2017.109.0121
Scale Formation Under Blended Phosphate Treatment for a Utility With Lead Pipes
Wasserstrom, Lauren W.1; Miller, Stephanie A.2; Triantafyllidou, Simoni3; Desantis, Michael K.4; Schock, Michael R.3
发表日期2017-11-01
ISSN2164-4535
卷号109期号:11页码:E464-E478
英文摘要

US corrosion control practice often assumes that the orthophosphate component of blended phosphate corrosion inhibitors causes the formation of low-solubility lead-orthophosphate solids that control lead release into drinking water. This study identified the solids that formed on the interior surface of a lead service line and a galvanized steel pipe excavated from a system using a proprietary blended phosphate chemical. The scale was analyzed by X-ray diffraction, X-ray fluorescence, and scanning electron microscopy/energy dispersive spectroscopy. Instead of crystalline lead-orthophosphate solids, a porous amorphous layer rich in aluminum, calcium, phosphorus, and lead was observed at the lead pipe scale-water interface. Thus, the mechanism inhibiting lead release into the water was not a thermodynamically predictable passivating lead-orthophosphate scale, but rather an amorphous barrier deposit that was possibly vulnerable to disturbances. Galvanized pipe scales showed relatively crystalline iron and zinc compounds, with additional surface deposition of aluminum, phosphorus, calcium, and lead.


英文关键词blended phosphate;corrosion scale mineralogy/morphology;galvanized pipe;lead corrosion
语种英语
WOS记录号WOS:000422945900002
来源期刊JOURNAL AMERICAN WATER WORKS ASSOCIATION
来源机构美国环保署
文献类型期刊论文
条目标识符http://gcip.llas.ac.cn/handle/2XKMVOVA/57223
作者单位1.AWWA, Denver, CO USA;
2.Trinity Consultants, Westerville, OH USA;
3.US EPA, Off Res & Dev, Natl Risk Management Res Lab, Cincinnati, OH 45268 USA;
4.US EPA, Oakridge Inst Sci & Educ, Off Res & Dev, Natl Risk Management Res Lab, Cincinnati, OH 45268 USA
推荐引用方式
GB/T 7714
Wasserstrom, Lauren W.,Miller, Stephanie A.,Triantafyllidou, Simoni,et al. Scale Formation Under Blended Phosphate Treatment for a Utility With Lead Pipes[J]. 美国环保署,2017,109(11):E464-E478.
APA Wasserstrom, Lauren W.,Miller, Stephanie A.,Triantafyllidou, Simoni,Desantis, Michael K.,&Schock, Michael R..(2017).Scale Formation Under Blended Phosphate Treatment for a Utility With Lead Pipes.JOURNAL AMERICAN WATER WORKS ASSOCIATION,109(11),E464-E478.
MLA Wasserstrom, Lauren W.,et al."Scale Formation Under Blended Phosphate Treatment for a Utility With Lead Pipes".JOURNAL AMERICAN WATER WORKS ASSOCIATION 109.11(2017):E464-E478.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Wasserstrom, Lauren W.]的文章
[Miller, Stephanie A.]的文章
[Triantafyllidou, Simoni]的文章
百度学术
百度学术中相似的文章
[Wasserstrom, Lauren W.]的文章
[Miller, Stephanie A.]的文章
[Triantafyllidou, Simoni]的文章
必应学术
必应学术中相似的文章
[Wasserstrom, Lauren W.]的文章
[Miller, Stephanie A.]的文章
[Triantafyllidou, Simoni]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。