Influence of project characteristics, regulatory pathways, and environmental complexity on hydropower licensing timelines in the US | |
Pracheil B.M.; Levine A.L.; Curtis T.L.; Aldrovandi M.S.P.; Uría-Martínez R.; Johnson M.M.; Welch T. | |
发表日期 | 2022 |
ISSN | 0301-4215 |
卷号 | 162 |
英文摘要 | In the U.S., hydropower is expected to play an important role in supporting a zero-carbon energy transition so it's becoming increasingly important the hydropower regulatory process provides robust environmental and other protections while maintaining regulatory efficiency. In this study, we created a dataset of project and license characteristics and milestones using hydropower licensing documents from 107 randomly selected projects to 1) quantify the length of steps in the licensing timeline and 2) quantitatively identify factors associated with licensing timeline length and sources of uncertainty. We found original licenses had shorter average timelines than relicenses and project capacity was only related to timeline length when license type (i.e., original, relicense) was included in analyses. Both licensing timeline length and variability were impacted by the licensing process (Alternative, Integrated, Traditional) used. Projects with greater environmental complexity (e.g., endangered species) had significantly longer timelines than projects that were less environmentally complex. We attributed shorter timelines for original licenses to lower environmental complexity (e.g., no endangered species) because most original licenses involved development of already impacted sites. Projects with greater environmental complexity significantly impact resources that may require greater stakeholder involvement and increased study that can lead to longer licensing timelines. © 2022 The Authors |
语种 | 英语 |
scopus关键词 | Hydroelectric power; Carbon energy; Endangered species; Energy transitions; Environmental complexity; Licensing process; Project characteristics; Regulatory pathway; Regulatory process; Sources of uncertainty; Zero carbons; Conservation; energy policy; environmental effect; project management; quantitative analysis; regulatory approach; regulatory framework; stakeholder; United States |
来源期刊 | Energy Policy |
文献类型 | 期刊论文 |
条目标识符 | http://gcip.llas.ac.cn/handle/2XKMVOVA/256360 |
作者单位 | Environmental Sciences Division, Oak Ridge National Laboratory, Oak Ridge, TN 37831, United States; Strategic Energy Analysis Center, National Renewable Energy Laboratory, Golden, CO 80401, United States; Water Power Technologies Office, Department of Energy, Washington, D.C 20585, United States |
推荐引用方式 GB/T 7714 | Pracheil B.M.,Levine A.L.,Curtis T.L.,et al. Influence of project characteristics, regulatory pathways, and environmental complexity on hydropower licensing timelines in the US[J],2022,162. |
APA | Pracheil B.M..,Levine A.L..,Curtis T.L..,Aldrovandi M.S.P..,Uría-Martínez R..,...&Welch T..(2022).Influence of project characteristics, regulatory pathways, and environmental complexity on hydropower licensing timelines in the US.Energy Policy,162. |
MLA | Pracheil B.M.,et al."Influence of project characteristics, regulatory pathways, and environmental complexity on hydropower licensing timelines in the US".Energy Policy 162(2022). |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。