Climate Change Data Portal
Study on Risk Assessment of Tunnel Engineering Based on The Time-reliability | |
Jia Jianqing; Lai Yuanming![]() | |
发表日期 | 2012 |
ISSN | 0974-262X |
起始页码 | 774 |
结束页码 | 778 |
卷号 | 5期号:4 |
英文摘要 | The primary risk-resources of tunnel engineering is summed up, the risk index methods of risk assessment are analyzed and the time-failure probability is defined, which is the ratio of arc AB and arc OB. Arc AB is the distance between the intersection of the displacement time-curve and the threshold value of displacement and the displacement convergence value and arc OB is the distance between the action position of surrounding rock or supports and the convergence valve of displacement. The assessment method of risk losses is analyzed too. |
英文关键词 | Tunnel; risk assessment; time-reliability |
语种 | 英语 |
WOS研究方向 | Geology ; Meteorology & Atmospheric Sciences ; Water Resources |
WOS类目 | Geosciences, Multidisciplinary ; Meteorology & Atmospheric Sciences ; Water Resources |
WOS记录号 | WOS:000313100100126 |
来源期刊 | DISASTER ADVANCES
![]() |
文献类型 | 期刊论文 |
条目标识符 | http://gcip.llas.ac.cn/handle/2XKMVOVA/239512 |
作者单位 | [Jia Jianqing; Lai Yuanming] Chinese Acad Sci, Cold & Arid Reg Environm & Engn Res Inst, Lanzhou 730000, Peoples R China; [Jia Jianqing; Li Yuwei] Lanzhou Jiaotong Univ, Sch Traff & Transportat, Lanzhou 730070, Peoples R China; [Wang Hongtu] Chongqing Univ, State Key Lab Coal Mine Disaster Dynam & Control, Chongqing 400044, Peoples R China |
推荐引用方式 GB/T 7714 | Jia Jianqing,Lai Yuanming,Li Yuwei,et al. Study on Risk Assessment of Tunnel Engineering Based on The Time-reliability[J],2012,5(4). |
APA | Jia Jianqing,Lai Yuanming,Li Yuwei,&Wang Hongtu.(2012).Study on Risk Assessment of Tunnel Engineering Based on The Time-reliability.DISASTER ADVANCES,5(4). |
MLA | Jia Jianqing,et al."Study on Risk Assessment of Tunnel Engineering Based on The Time-reliability".DISASTER ADVANCES 5.4(2012). |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。