Exploring the link between project delays and cancelation rates in the U.S. rooftop solar industry | |
Cook J.J.; Cruce J.; O'Shaughnessy E.; Ardani K.; Margolis R. | |
发表日期 | 2021 |
ISSN | 03014215 |
卷号 | 156 |
英文摘要 | About 1 in 10 rooftop solar photovoltaic (PV) customers who sign a contract to install a PV system cancel their contract before the system is installed. Although some cancelation risk is inherent in the solar industry, there may be ways to reduce cancelation volume, such as reducing project delays. Delays can occur at each stage of PV adoption processes, which take several weeks to months from contract signature to system operation. Using data from a recent survey of PV installers, we explore the factors that explain PV project delays and cancelations. The survey data suggest that PV adoptions take about 16 weeks, on average, from contract signature until system operation. Survey respondents consistently identified permitting, inspection, and interconnection (PII) processes as key drivers of project delays. Most respondents then suggested these PII-related delays increase contract cancelations. However, larger-scale installers report higher cancelation rates, and these installers rank changes in customer financial situations higher than PII-related delays as the main cause for cancelations. Most respondents also reported avoiding jurisdictions with particularly onerous PII requirements or charging more in these jurisdictions. On balance, the results provide a rationale for measures to streamline PII processes to reduce delays and potentially mitigate cancelation risk. © 2021 Elsevier Ltd |
关键词 | CancellationsInspectionInterconnectionPermittingSolarUtilities |
英文关键词 | Risk assessment; Solar power generation; Surveys; Cancelation; Contract signature; Interconnection; Permitting; Photovoltaics; Project delays; Solar; Solar industries; Systems operation; Utility; Inspection |
语种 | 英语 |
来源期刊 | Energy Policy
![]() |
文献类型 | 期刊论文 |
条目标识符 | http://gcip.llas.ac.cn/handle/2XKMVOVA/205062 |
作者单位 | National Renewable Energy Laboratory, 15013 Denver West Parkway, GoldenCO 80401, United States; Clean Kilowatts, LLC, United States |
推荐引用方式 GB/T 7714 | Cook J.J.,Cruce J.,O'Shaughnessy E.,et al. Exploring the link between project delays and cancelation rates in the U.S. rooftop solar industry[J],2021,156. |
APA | Cook J.J.,Cruce J.,O'Shaughnessy E.,Ardani K.,&Margolis R..(2021).Exploring the link between project delays and cancelation rates in the U.S. rooftop solar industry.Energy Policy,156. |
MLA | Cook J.J.,et al."Exploring the link between project delays and cancelation rates in the U.S. rooftop solar industry".Energy Policy 156(2021). |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。