CCPortal
DOI10.1038/s41893-018-0022-3
Improved trade-offs of hydropower and sand connectivity by strategic dam planning in the Mekong
Schmitt R.J.P.; Bizzi S.; Castelletti A.; Kondolf G.M.
发表日期2018
ISSN2398-9629
起始页码96
结束页码104
卷号1期号:2
英文摘要Dams in the Mekong Basin are mostly planned project-by-project and without strategic analysis of their cumulative impacts on river processes such as sediment connectivity. We analyse missed and future opportunities for reducing hydropower impacts on sediment connectivity through strategic planning of dams in the Se Kong, Se San and Sre Pok ('3S') tributaries of the lower Mekong, which are critically important as a source of sand for the Mekong Delta. With strategic planning, 68% of the hydropower potential of the 3S Basin could have been developed while trapping 21% of the basin's sand load. The current dam portfolio resulting from project-by-project planning uses 54% of the hydropower potential while trapping 91% of the sand load. Results from the 3S demonstrate that strategic network-scale planning is crucial for developing lower-impact hydropower, a relevant finding given the at least 3,700 major dams that are proposed worldwide. © 2018 The Author(s).
语种英语
scopus关键词Dams; Economic and social effects; Hydroelectric power; River basin projects; Sand; Strategic planning; Cumulative impacts; Hydropower potential; Mekong Delta; Network scale; Project planning; Strategic analysis; Trade off; Hydroelectric power plants
来源期刊Nature Sustainability
文献类型期刊论文
条目标识符http://gcip.llas.ac.cn/handle/2XKMVOVA/163482
作者单位Natural Capital Project, Department of Biology and the Woods Institute for the Environment, Stanford University, Stanford, CA, United States; Department of Electronics, Information, and Bioengineering, Politecnico di Milano, Milan, Italy; Department of Landscape Architecture and Environmental Planning, University of California, Berkeley, CA, United States; Institute of Environmental Engineering, ETH Zurich, Zurich, Switzerland; Collegium-Lyon Institute for Advanced Study, University of Lyon, Lyon, France
推荐引用方式
GB/T 7714
Schmitt R.J.P.,Bizzi S.,Castelletti A.,et al. Improved trade-offs of hydropower and sand connectivity by strategic dam planning in the Mekong[J],2018,1(2).
APA Schmitt R.J.P.,Bizzi S.,Castelletti A.,&Kondolf G.M..(2018).Improved trade-offs of hydropower and sand connectivity by strategic dam planning in the Mekong.Nature Sustainability,1(2).
MLA Schmitt R.J.P.,et al."Improved trade-offs of hydropower and sand connectivity by strategic dam planning in the Mekong".Nature Sustainability 1.2(2018).
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Schmitt R.J.P.]的文章
[Bizzi S.]的文章
[Castelletti A.]的文章
百度学术
百度学术中相似的文章
[Schmitt R.J.P.]的文章
[Bizzi S.]的文章
[Castelletti A.]的文章
必应学术
必应学术中相似的文章
[Schmitt R.J.P.]的文章
[Bizzi S.]的文章
[Castelletti A.]的文章
相关权益政策
暂无数据
收藏/分享

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。