Climate Change Data Portal
| DOI | 10.1016/j.enpol.2019.111133 |
| Erratum to “Multi-objective planning of building stock renovation” (Energy Policy (2019) 130 (101–110), (S0301421519302265), (10.1016/j.enpol.2019.03.053)) | |
| Guariso G.; Sangiorgio M. | |
| 发表日期 | 2020 |
| ISSN | 0301-4215 |
| 卷号 | 137 |
| 英文摘要 | The publisher regrets to inform that the following lines were missing in section 3, after line 9: [Formul presented] Where cij is the unit cost and rij the energy reduction obtained from the adoption of measure j on a building of class i. The following constraints must hold: The publisher would like to apologise for any inconvenience caused. © 2019 Elsevier Ltd |
| 语种 | 英语 |
| 来源期刊 | Energy policy
![]() |
| 文献类型 | 期刊论文 |
| 条目标识符 | http://gcip.llas.ac.cn/handle/2XKMVOVA/124909 |
| 作者单位 | Department of Electronics Information and Bioengineering, Politecnico di Milano, Via Ponzio 34/5, Milano, 20133, Italy |
| 推荐引用方式 GB/T 7714 | Guariso G.,Sangiorgio M.. Erratum to “Multi-objective planning of building stock renovation” (Energy Policy (2019) 130 (101–110), (S0301421519302265), (10.1016/j.enpol.2019.03.053))[J],2020,137. |
| APA | Guariso G.,&Sangiorgio M..(2020).Erratum to “Multi-objective planning of building stock renovation” (Energy Policy (2019) 130 (101–110), (S0301421519302265), (10.1016/j.enpol.2019.03.053)).Energy policy,137. |
| MLA | Guariso G.,et al."Erratum to “Multi-objective planning of building stock renovation” (Energy Policy (2019) 130 (101–110), (S0301421519302265), (10.1016/j.enpol.2019.03.053))".Energy policy 137(2020). |
| 条目包含的文件 | 条目无相关文件。 | |||||
| 个性服务 |
| 推荐该条目 |
| 保存到收藏夹 |
| 导出为Endnote文件 |
| 谷歌学术 |
| 谷歌学术中相似的文章 |
| [Guariso G.]的文章 |
| [Sangiorgio M.]的文章 |
| 百度学术 |
| 百度学术中相似的文章 |
| [Guariso G.]的文章 |
| [Sangiorgio M.]的文章 |
| 必应学术 |
| 必应学术中相似的文章 |
| [Guariso G.]的文章 |
| [Sangiorgio M.]的文章 |
| 相关权益政策 |
| 暂无数据 |
| 收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。