Climate Change Data Portal
DOI | 10.1016/j.enpol.2019.111133 |
Erratum to “Multi-objective planning of building stock renovation” (Energy Policy (2019) 130 (101–110), (S0301421519302265), (10.1016/j.enpol.2019.03.053)) | |
Guariso G.; Sangiorgio M. | |
发表日期 | 2020 |
ISSN | 0301-4215 |
卷号 | 137 |
英文摘要 | The publisher regrets to inform that the following lines were missing in section 3, after line 9: [Formul presented] Where cij is the unit cost and rij the energy reduction obtained from the adoption of measure j on a building of class i. The following constraints must hold: The publisher would like to apologise for any inconvenience caused. © 2019 Elsevier Ltd |
语种 | 英语 |
来源期刊 | Energy Policy
![]() |
文献类型 | 期刊论文 |
条目标识符 | http://gcip.llas.ac.cn/handle/2XKMVOVA/118194 |
作者单位 | Department of Electronics Information and Bioengineering, Politecnico di Milano, Via Ponzio 34/5, Milano, 20133, Italy |
推荐引用方式 GB/T 7714 | Guariso G.,Sangiorgio M.. Erratum to “Multi-objective planning of building stock renovation” (Energy Policy (2019) 130 (101–110), (S0301421519302265), (10.1016/j.enpol.2019.03.053))[J],2020,137. |
APA | Guariso G.,&Sangiorgio M..(2020).Erratum to “Multi-objective planning of building stock renovation” (Energy Policy (2019) 130 (101–110), (S0301421519302265), (10.1016/j.enpol.2019.03.053)).Energy Policy,137. |
MLA | Guariso G.,et al."Erratum to “Multi-objective planning of building stock renovation” (Energy Policy (2019) 130 (101–110), (S0301421519302265), (10.1016/j.enpol.2019.03.053))".Energy Policy 137(2020). |
条目包含的文件 | 条目无相关文件。 |
个性服务 |
推荐该条目 |
保存到收藏夹 |
导出为Endnote文件 |
谷歌学术 |
谷歌学术中相似的文章 |
[Guariso G.]的文章 |
[Sangiorgio M.]的文章 |
百度学术 |
百度学术中相似的文章 |
[Guariso G.]的文章 |
[Sangiorgio M.]的文章 |
必应学术 |
必应学术中相似的文章 |
[Guariso G.]的文章 |
[Sangiorgio M.]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。